All active GRAFT 外装 installation and application protocols. Read in full before beginning any installation. Failure to follow documented procedures voids all quality guarantees.
Structural Panel Installation
Panel sequencing, mounting point prep, snap-fit tolerances, and ROM clearance verification for full structural armor kits.
Surface Wrap Protocol
Surface decontamination, panel sequencing, heat-activation procedure, and edge sealing for precision vinyl wraps.
Technical Garment Installation
Garment fitting sequence, ROM clearance mapping, joint gusset verification, and operational clearance sign-off.
Paints & Surface Pigments
Adhesion promotion, mecha pigment application, and cure time protocol for high-performance polymer surfaces.
Water-Slide & Thermal Transfer
Surface prep, decal positioning, flush application methodology, and sealing for permanent identification marks.